| Quality Control | Quality Assurance |
Definition | QC is about checking at the end of some development process (e.g. - a design activity) that we have built quality in i.e. that we have achieved the required quality with our methods. | QA is about having an overall development and management process that provides right environment for ensuring quality of final product. |
Description | QC is like testing a module against requirement specification or design document, measuring response time, throughput etc. | QA gives us added assurance that the whole producing or checking process is properly planned and executed and thus maintaining high quality. |
What it does | To check that the modern methods of software development are largely designed to ensure right quality is achieved. QC checks that these methods are in place and to discover where they are not then corrections are to be made. | It gives us added assurance that the while producing / checking process is being properly planned and executed and hence is keeping high our chances of producing software of required quality. |
Stages | Define features and levels Define feature check procedure Carrying out the check procedure Record the result take and record any corrective action taken. | 1. Determination of quality policy through Quality Management System 2. Checking that predetermined Quality control activities are being properly taken care off. |
Best carried out on | QC is best carried out on products | QA is best carried out on process. |
Phase of implementation | QC should take place at every stage of SDLC. | QA should be done at end of every SDLC i.e. when product building is complete. |
Technique | Structured walkthrough, Fagan Techniques are some of QC techniques. | Quality policy defined and generally implemented in the form of Quality Management System is used to carry out QA. |
Tuesday, August 26, 2008
Difference between Quality Control and Quality Assurance?
Difference between Verification and Validation?
S no. | Verification | Validation |
1. | Verification is a static testing procedure. | Validation is dynamic testing procedure. |
2. | It involves verifying the requirements, detailed design documents, test plans, walkthroughs and inspections of various documents produced
| Validation involves actual testing of the product as per the test
|
3. | It is a preventive procedure. | It is a corrective procedure. |
4. | Are we building the product RIGHT? | Are we building the RIGHT product? |
5. | It involves more then two to three persons and is a group activity. | It involves the testers and sometimes user. |
6. | It is also called Human testing, since it involves finding the errors by persons participating in a review or walk through. | It is also called Computer testing, since errors are found out by testing the software on a computer. |
7. | Verification occurs on Requirements, Design and code. | Validation occurs only on code and the executable application. |
8. | Verification is made both in the Executable and Non Executable forms of a work product | Validation is done only on Executable forms of a work product. |
9. | Verification finds errors early in the requirement & design phase and hence reduces the cost of errors. | Validation finds errors only during the testing stage and hence cost of errors reduced is less than Verification. |
10. | An effective tool for verification tool is a Checklist. | Various manual and automated test tools are available for Validation. |
11. | It requires cooperation and scheduling of meetings and discussions. | It is to check that the product satisfies the requirements and is accepted by the user. |
12. | Verification tasks include: 1) Planning
2) Execution | Validation tasks include: 1) Planning
2) Test ware Development 3) Test Execution
4) Test ware Maintenance |
13. | Verification activities include:
1) Requirements Verification 2) Functional design verification
3) Internal Design Verification 4) Code Verification | Validation activities include: 1) Unit testing
2) Usability testing 3) Function testing
4) System testing
5) Acceptance testing |
14. | Verification deliverables (work products) are: 1) Verification test plan 2) Inspection report 3) Verification test report | Validation deliverables are: 1) Test plan
2) Test Design Specification 3) Test Case Specification
4) Test Procedure Specification 5) Test log
6) Test incident report |
Monday, August 25, 2008
Interview Questions on Test Director...
Hi Friends... Hope it is useful to all of us....
Q: What is TestDirector?
TestDirector is a test management tool produced by Mercury Interactive. Its four modules - Requirements, Test Plan, Test Lab and Defects Manager - are integrated to enable information to flow smoothly between different stages of the testing process. Completely Web-enabled, TestDirector supports communication and collaboration among distributed testing teams. TestDirector has been classified in the following categories:Defect TrackingTesting and AnalysisDebuggingAutomated Software Quality (ASQ)
Q: What is the use of Test Director software?
TestDirector is Mercury Interactive's software test management tool. It helps quality assurance personnel plan and organize the testing process. With TestDirector you can create a database of manual and automated tests, build test cycles. TestDirector is not used for executing any actual test activity but it is a test management tool used for Requirements Management, Test Plan, Test Lab, and Defects Management. Even if the individual test cases are not automated, TestDirector can make life much easier during the test cycles.
Q: How you integrated your automated scripts with TestDirector?
When you work with WinRunner, you can choose to save your tests directly to your TestDirector database or while creating a test case in the TestDirector we can specify whether the script in automated or manual. And if it is automated script then
Q: Is there any possibility to restrict duplication of defects being created in TD?
No Way. The only thing we can do is to find the similar defects and delete or close them.
Q: What is Quality Center( Test Director)?
You can use Quality Center to create a project (central repository) of manual and automated tests and components, build test cycles, run tests and components, and report and track defects. You can also create reports and graphs to help you review the progress of test planning, runs, and defect tracking before a software release. When you work in QuickTest, you can create and save tests and components directly to your Quality Center project. You can run QuickTest tests or components from Quality Center and then use Quality Center to review and manage the results. You can also use Quality Center with Business Process Testing support to create business process tests, comprised of the components you create in either QuickTest or Quality Center with Business Process Testing support.
Q: After creating the test cases in excel and exported to TD. How does test director know the headings?
To export the test cases from spreadsheet to TD there are 8 steps. In 6th step we need to map the Td fields with corresponding Spreadsheet columns. Hence you are the mapping so you can map according to your specifications.
Q: How to use TestDirect like a Dashboard?
The new version of TD (TestDirector for Quality Center) should provide you with that. If you not want to upgrade, you have to design your own "start page", include the apps and bits you want to display, and use code to extract data from TD.
Q: Can you retrieve a test case once you have deleted them in Test Director ?
In Quality Center, if you delete entire folder with tests, the tests get stored in Unattached folder. But if you just deleted 'individual' tests, they are GONE! and can't be retrieved. Not sure if Test Director has the same behaviour/functionality. There are 2 options in QC. one is remove and another is delete. the diffrence is that .once it is remove it is removed from test set but avail in QC directory. If it is deleted, you can't retrive. If you press delete that will delete from that QC directory also.
Q: How do we import testcases written in Excel to Test Director
Use Mecury Interactive Microsoft Excel Add-in for importing test cases written in excel sheet. It is available on Add-ins page. Select the rows in excel which you want to upload to TD Then select export to TD option under tools menu
Q: Is it necessary to learn Test Director for beginners
Test director is a test mangement tool, it is used across all major organizations and is generally used for management of all test activities in organization. It is important to learn this tool, but for beginners it is enough to understand how to log defects into it and how to run tests using it.
Q: Can you please explain the procedure of connecting TestDirector in QTP?
To connect to TD from QTP follow the steps...Open Qtp ==> Tools ==> Select TestDirector Connection ==> In Server Connction Box Enter TD address(URL of TD) ==> Click Connect==> In project Connection Box Enter the Details Domain,Project,User name and Password ==> Click Connect If you want to reconnect on startup check the reconnect on startup and save password for reconnection on startup. Then close.
Q: What are the various types of reports in TestDirector?
For each and every phase we can get reports, like for requirements, test cases, and test run. There are some types of reports also available like report summary, progress report and requirements coverage report. Each and every test director client tool consists of a menu bar Analysis. By using this menu you can crate reports in table format. You can generate graphs. All graphs options in maths are supported. And you can create various types of charts too.
Q: TD (Quality Center 9.0) how can you run automated test cases?
While designing your test steps in QC for automation tests in test plan module, Test Script tab is availble. You can generate script here or copy from your automatioon tool. While running your tests, it will ask for on which host you want to run. You need to select the system in your network. Then run it. Before going to run your script in a system, the automation tool, like WinRunner, must be installed on that system. Otherwise you will get an error.
Q: Can we add user defined fields to Test Director?
Yes. We can add the user defined fields using TD 8.0, But you need to have admin priviliges to this.
Q: How do we attach Excel sheet with test director?
This function is for getting datatable(excel sheet) in test director. Try to use it and as vbs file and call this function to get ur datatable. GetAttachment(FileName, OutPath) FileName The name of the attachment that needs to be copiedOutPath The folder location where the file needs to be storedReturn value The full path where the file has been copied on the local file systemExample:FilePath = GetAttachment("test.pdf", "C:")MsgBox "Your file is here:" & FilePathThe GetAttachmentFromTest finds the attachment associated to the given test name and stores it in a local folder.GetAttachmentFromTest(TestName, FileName, OutPath)TestName The name of the test where the attachment is locatedFileName The name of the attachment that need to be copiedOutPath The folder location where the file needs to be storedReturn value The full path where the file has been copied on the local file systemExample:FilePath = GetAttachmentFromTest("Attachment", "hello.vbs", "C:aa")MsgBox "Your file is here:" & FilePath
Q: What is the use of Test Lab in Test director?
Test Lab can be used to create a test set. You can add one or many test cases into a test set. Then run all test cases in a test set together and change the status as pass/fail.
Q: Can we map the Defects directly to the requirements (not thru the test cases) in the Test Director?
Yes. Create your req. structure.Create the test case structure and the test casesMap the testcases to the apr. req.Run and report bugs from your test cases in the test lab module.The database structure in TD is mapping testcase to defects, only if you have created the bug from the apr. test case. Maybe you can update the mapping by using some code in the bug script module (from the customize project funktion), as fare as I know, its not possible to map defects directly to an req.
Q: How do I run reports from Test Director?
This is how you do it:1. Open the test director project.2. Display the requirements module.3. Chose reportAnalysis > Reports > Standard Requirements Report.
Q: Can we export the files from Test director to Excel Sheet? If yes then how?
Design tab -- Right click -> go to save as -> select excel and save it Requirement tab -- Right click on main req/ click on export/ save as word, excel or other template. This would save all the child requirement. Test plan tab-- only individual test can be exported. No parent--child export is possible.Select a test script. click on the design steps tab. right click anywhere on the open window. click on export and save as.... Test lab tab-- select a child group. Click on execution grid if it is not selected. right click anywhere . default save option is excel. but can be saved in doc and other formats. select 'all' or 'selected' option. defects tab -- right click anywhere on the window, export all or 'selected' defects and save excel sheet or document
Q: Can we upload test cases from an excel sheet into Test Director?
Yes, you can do that. Go to Add In menu in TestDirector, find the Excel add in, and install it in you machine. Now open excel, you can find the new menu option export to Test director. Rest of the procedure is self explanatory
Q: How can we map a single defect to two test scripts? Is there a way in test director so that we can state that defect defect X is same for test script A and test script B?
No way. When you run a script, you find and generate a defect report. In other words, every defect report is unique to a single test script.
Q: How can we create our own Defect Template from Test Director? Is it possible in Test Director? If possible how we can Create our Own Template?
You can not create your own template for defect reporting in Test Director but you can customize the Template in Test Director
Q: How can we export multiple test cases from TD in a single go?
Open any test and click on the tab 'design step'. Once it opens, you can right click on the first cell and export into any format .
Q: How to customize the reports generated?
This depends a lot of what you are interested in "reporting on". You have to combine both SQL and VB script to extract data from TD to Excel. Its also possible to "customize" the standard reports given from the "analyze" tab, this is written in XML if you are familiar with this language. If you log in to Mercury support you will be able to find a lot of code examples.
Q: How many tabs in TestDirector and explain them?
there are 4 tabs available in Testdirector.1. Requirement -> to track the customer requirenments2. Testplan -> to design the testcases & to store the testscripts3. Testlab -> to exectue the testsets & track the results4. Defect -> to log a defect & to track the logged defects
Q: How to map requirements with testcases in TestDirector?
1. In requirements TAB select coverage view.2. Select requirement by clicking on Parent/Child or grand Child.3. On right hand side (in Coverage View Window) another window will appear. It has two TABS (a) Tests Coverage (b) Details. Test Coverage TAB will be selected by default or you click it.4. Click on Select Tests Button. A new window will appear on right hand side and you will see a list of all tests. You can select any test case you want to map with you requirement.
Q: How to use TestDirector in real time projects?
Once completed the preparing of the test cases.1. Export the test cases in to Test Director. ( it will contain total 8 steps).2. The test cases will be loaded in the Test Plan module.3. Once the execution is started, we move the test cases from Test Plan tab to the Test Lab module.4. In Test Lab, we execute the test cases and put as pass or fail or incomplete. We generate the graphs in the test lab for daily report and sent to the onsite (where ever you want to deliver).5. If you got any defects and raise the defect in the defect module. When raising the defect ,attach the defect with the screen shot.
Q: How can we add requirements to test cases in Test Director?
You can add requirements to test cases in two ways; either from Requriements tab or Test Plan tab. Navigate to the appropriate Requirement and right click, you can find the menu to map the test case and the vice versa is available in Test plan tab.
Q: What does Test Grid contains ?
The Test Grid displays all the tests in a TestDirector project. The Test Grid contains the following key elements: Test Grid toolbar, with buttons of commands commonly used when creating and modifying the Test Grid. Grid filter, displaying the filter that is currently applied to a column. Description tab, displaying a description of the selected test in the Test Grid. History tab, displaying the changes made to a test. For each change, the grid displays the field name, date of the change, name of the person who made the change, and the new value.
Q: How to generate the graphs in Test Director ?
An1:Open test director and then click the Analysis you will find three type of graphs Planning Progress Graphs Planning Summary Graphs Defect Age Graph Click any of one and you can generate the graphs..
An2:The generation of graphs in the Test Director that to Test Lab module is :1. Analysis2. Graph3. Graph Wizard4.Select the graph type as Summary and click the Next button.5.Select the show current tests and click the next button.6.Select the Define a new filter and click the Filter button.7. Select the test set and click the Ok button.8.Select the Plan : subject and click the ok button.9. Select the Plan: Status10 Select the test set as x- Axis11. Click the Finish button.
Q: What is the difference between Master test plan and test plan?
Master test plan is the doccumaent in which each and every functional point is validated. Test case docuument contains test cases, Test case is the perception with which probability of finding the defect is more.
Q: What is the main purpose of storing requirements in Test Director?
In TestDirector(Requirement Tab) We Stores Our Project Requirement documents according to our modules or functionality of the applications. This helps us to makes sures that all requirements are covered when we trace developed Test Case/Test Script to the requirements. This helps QA Manager to review what extent the requirements are covered.
Q: What are the 3 views and what is the purpose of each view?
The 3 views of requirment are: 1)Document View-tabulated view2)Coverage View-establish a relationship between requirement and the test assosiated with them along with their execution status.Mostly the requirements are written in this view only.3)Coverage analysis view-show a chart with requirementassociated with the test,and execution status of the test.
Q: How many types of reports can be generated using TestDirector?
Reports on TestDirector display information about test requirements, the test plan, test runs, and defect tracking. Reports can be generated from each TestDirector module using the default settings, or you can customize them. When customizing a report, you can apply filters and sort conditions, and determine the layout of the fields in the report. You can further customize the report by adding sub-reports. You can save the settings of your reports as favorite views and reload them as needed.
Q: How will you generate the defect ID in test director? Is it generated automatically or not?
The Defect ID will be generated automatically after the submission of the defect..
Q: How do you ensure that there are no duplication of bugs in Test Director?
In the defect tracking window, at the top we can see the find similar defect icon. If we click after writing our defect, if any of the tester already added the similar defect it will tell. Else we can add.
Q: Difference between WinRunner and Test Director?
WinRunner: Its an Automation Testing tool, used for automation of manual written Test Cases to Test Scripts and Regression Test also. Test Director: Its an Testing Management tool, used from Creating Test Plan,Preparation of testCases, execution of testcases and generating defect report.Also used for maintaining Test Scripts.
Q: How to add Test ID to TestPlan?
Create an object with a type = Number. Name it something like "Test_ID" in the Customize Entities area. Then go into the Workflow Script Editor to "TestPlan module script/TestPlan_Test_MoveTo" and insert the following: if Test_Fields.Field("Your Object Name").Value <> Test_Fields.Field ("TS_TEST_ID").Value then Test_Fields.Field("Your Object Name").Value = Test_Fields.Field("TS_TEST_ID").Value end if This will put an object on each test thet displays the Test ID Number.